FL5 days left
Phillippi Creek Phase II Maximum Allowable Dredging
Sarasota County
- Buyer
- Sarasota County
- Location
- Florida
- Due
- Oct 28, 2026
- Posted
- Sep 25, 2026
- Industry
- Construction & infrastructure
- Source
- OpenGov Portals
Summary
What is the solicitation method? Project consists of dredging approximately 71,683 CY over an estimated 33,500 LF with dredge material management area preparation, material handling, disposal, turbidity control & monitoring, and site restoration. Dredging will be performed within the limits to restore the permitted design elevation of -4 feet MLW between US 41 & South Beneva Road. Bidder's offer s…
Bidnator finds bids and helps you prepare; you submit your response to the buyer directly.